The three parts of the steeple sitting on the ground unassembled.
|
We need a hole in the roof to allow access to the inside of the steeple once it's installed..
|
The bottom section is lifted to the roof with a crane.
|
The bottom section is now on the roof. So far, so good!.
|
The crane lifts the second section up on the roof..
|
The second section is in it's new home. Now we're getting the hang of it
|
Chuck Brechler, our steeple engineer, steadies the third section as the crane moves it.
|
The third section is on the way to the top..
|
The last stage is in place.
|
These are some the people who worked so hard to get the job done.
|
Bonnie and Steve can now really sing "Beneath the Cross of Jesus".
|
|
 The Church at Christmas. |
 The Church at Easter. |
 Ladies prepare to sing, " More To See". |
 Easter Communion |
 Part of the Memorial Day Congregation of 161 people |
 More of the Memorial Day Congreation |
 Even some in the balcony. What a joy! |
|